01Our process

From a closed lot to your first morning in it.

Every May home moves through the same seven checkpoints — discovery, design, permits, budget, build, walkthrough, and the day it’s yours. Patrizio signs off at every gate personally, the same discipline whether it’s your first meeting or your final walkthrough.

How a May home comes together

  1. 01

    Discovery

    We walk the lot and the life you are building around it, then turn inspiration, home type, and price into the same brief Patrizio and Matthew review before anything moves to design.

  2. 02

    Design with Native

    Native waits for your topographical survey, then designs your floor plan, interiors, and landscape as one connected package — interiors start early to protect the timeline, and landscape follows once the shape of the house is set.

Floor plans, interior selections, and landscape sketches from a Native design review
Design · by Native
  1. 03

    Permit-ready plans

    Patrizio reviews every version personally, and some homes run up to ten rounds before he signs off; once approved, Joel submits the permit package and the four utility applications that clear the project for build.

  2. 04

    Locked budget

    Kirk bids the approved plan to our trade partners and checks every number against an independent takeoff before it's accepted — the budget locks before a single purchase order goes out.

  3. 05

    Build

    One project manager runs your site through framing and trim-out while Joel pulls inspections and Matthew signs off on each milestone as it lands — no phase starts before the last one is actually finished.

A May Construction home mid-build, framed and moving through trim toward its certificate of occupancy
Framing · trim · CO
  1. 06

    Walkthrough

    With final inspections passed and your certificate of occupancy in hand, we walk the finished home against the plan and the selections sheet together, line by line.

  2. 07

    Your home

    Once every invoice is paid and every vendor is settled, we close the project record — and the first quiet morning in the house is yours to keep.

02Common questions

Straight answers, before you ask.

How long does a custom build take with May?

There's no single number, because each phase is gated by a real approval rather than a calendar date — design alone can run several review rounds before Patrizio signs off, and permit review can take anywhere from a few days to a few months depending on the municipality. What we can promise is a defined sequence — discovery, design, permitting, budget, build, walkthrough — with no phase started before the one before it is actually finished.

What does design with Native include?

Native, our in-house design arm, builds your floor plan, interior selections, and landscape design as one connected package once your topographical survey is in hand. Interior design starts early to keep the overall timeline tight, and landscape follows once the shape of the house is set — everything ships together as a permit-ready plan set.

How does May keep budgets from overrunning?

Nothing gets bid until your selections are locked, and every incoming bid is checked against an independent internal takeoff before it's accepted into the budget. If a design change happens after that budget is set, the affected trades are re-bid and the budget is updated openly — not absorbed quietly into a change order later.

What happens after move-in?

Once final inspections and your certificate of occupancy are in hand, we walk the finished home against the plan and the selections sheet together. Finance then closes out invoicing and collections on our side, and the project record only closes once every term is satisfied for both of us.

A house that feels like we made it, but without two years of pain.
WHAT SHE IS REALLY ASKING FOR
Ready when you are

See how your project would run.

Schedule a consult →